MiningStore Internal Platform
Replace Jira with a site development control tower.
Track each utility from intake through rate modeling, land control, zoning, interconnect, funding, and active development with agent-backed enrichment and human approval at every decision gate.
What This Ships
Utility-first model
One source of truth for contacts, substations, sites, artifacts, findings, stage reviews, and priority score.
Agent job fabric
Intake, rate, zoning, and infrastructure specialists enrich the record without silently advancing it.
Approval-led movement
Humans approve stage moves, outbound drafts, and critical commercial recommendations.
Deal prioritization
Weighted scoring gives the team a real queue instead of a pile of partly-known deals.
Pipeline Stages
Utility Intake
Initial contact, utility facts, and substation intelligence are being assembled.
Rate Discovery
The utility rate path is being confirmed or built.
Rate Confirmed
A viable rate model or approved path-to-rate is in hand.
Land Discovery
Parcels, zoning posture, and site feasibility inputs are being located.
Landowner LOI
Commercial control of the parcel is being negotiated.
Site Feasibility
Zoning, infrastructure, and site-plan diligence support a buildable path.
Interconnect + Permitting
Queue, permitting, and technical studies are underway.
Funding Ready
The opportunity is packaged for investment and go-forward approval.
Active Development
The deal is funded and actively moving through execution.
Parked
The deal remains viable but is blocked or deprioritized.
Won
The opportunity has converted into an active MiningStore site.
Lost
The opportunity was closed out or no longer pencils.
Workstreams
Utility
Utility relationship, rate path, power facts, and substation diligence.
Land
Parcel targeting, ownership control, and LOI/commercial diligence.
Site Design
Layout, container assumptions, target MW, and expandable design.
Water
Water needs, stormwater, culverts, and drainage requirements.
Network
Fiber availability, backhaul access, and telecom readiness.
Permitting
County zoning, CUP path, environmental review, and timeline risk.
Commercial + Funding
Utility LOI, land LOI, funding readiness, and deal packaging.
Operator Benefits